All Categories
Featured

Extensive water recycling, with 70-80% percent of stormwater overflow from around the site filtered through natural wetlands and mechanical systems, and after that used to water the surrounding parkland. 4,609,504 gallons of rainwater caught annually. Yearly carbon emissions reduction due to planting area of about 240,000 pounds of CO2 sequestered by trees on site 16.65 acres of total planting location (5.4 acres at SoFi Arena, 2.75 acres at Lake Park, and 7 acres of streetscape planting, to name a few 6-plus miles of new tracks and courses (4.17 miles of improved direct streetscape including pathways, 1.89 miles of brand-new multi-use routes, and about 2,300 direct feet of brand-new Class II on-street bikeways) More details in the complete press release below: a near 300-acre sports and entertainment location being established by dealt with a landscape architecture and metropolitan design studio, to develop civic and ecologically mindful landscape options across three essential areas: water capture and reuse, the utilization of one hundred percent Southern California-native plant species, and the continued advancement of public parks for year-round use.
Commercial Landscaping El Monte

Inspired by the initial water feature that belonged to the former Hollywood Park racetrack, Lake Park includes an upper and lower lake separated by cascading waterfalls. At around 6 acres and 16 million gallons of water, the lake is surrounded by an extra 6 acres of parkland. The lake operates as a water recycling system by gathering 70-80 percent of stormwater overflow from around the website, filtering it through natural wetlands and mechanical systems, and then utilizing it to water the surrounding parkland.
Latest Posts

The Evolution of Commercial Landscaping Through ESG

Top Tips for ESG Compliance in California Landscapes

Implementing Drought-Resistant Landscaping in Los Angeles